v4.0
Adds a relation between two clip objects' TimeControls. The relation is by default
between the StartOffset, ClipIn and ClipOut values of the master
and slave clip.
Please take note that this method will fail if the addition of a
new relation would create an evaluation cycle. For instance, let
say that you have three clips A, B and C. If you already have
ClipRelations between A-B and between B-C then attempting to add a
ClipRelation between C-A will fail.
oReturn = ClipContainer.AddRelation( MasterClip, SlaveClip, [Name] ); |
The newly created ClipRelation object.
Parameter | Type | Description |
---|---|---|
MasterClip | Clip | The master clip object. |
SlaveClip | Clip | The slave clip object. |
Name | String | The name of the new clip relation |
/* See the example for the ClipContainer.NestedRelations property. */ |